Canada Oil Sands Etfs

Power Plants in Italy

PERMITS FOR

THERMOELECTRIC POWER STATIONS ISSUED

IN 2002, 2003, 2004 BY THE MINISTRY OF

ACTIVITIES 'PRODUCTION

(List updated 11 November 2004)

Piedmont :

1. Edison Termoelettirca - Settimo Torinese (TO), 250 MWe, 470 MWt

2. AEM Torino - Moncalieri (TO), 770 MWe, 1350 MWt

3. Piedmont Energy - Leinì (TO), 380 MWe, 700 MWt

4. E. ON PRODUCTION ITALY - Livorno Ferraris (VC), 800 MWe, 1400 MWt

Lombardia :

5. Endesa Italy - Tavazzano (LO), combined cycle conversion

6. Voghera Energia - Voghera (PV), 400 MWe, 750 MWt

7. Enipower - Erbognone Ferrera (PV), 1040 MWe, 1850 MWt

8. ASM AMGS BS and VR - Ponti sul Mincio (MN), 250 MWe, 450 MWt

9. Enipower - Mantova, 780 MWe, 1370 MWt

10. AEM MI - ASM BS (ampliam.) - Cassano d’Adda (MI), 390 MWe, 700 MWt

Veneto :

11. Mirant Generation Portogruaro - Portogruaro (VE), 385 MWe, 680MWt

Friuli Venezia Giulia :

12. Edison-Torviscosa (UD), 800 MWe, 1500 MWt

Liguria :

13. Tirreno Power - Vado Ligure (SV), conversion to combined cycle

Emilia-Romagna :

14. Enipower - Ravenna (RA), 785 MWe, 1370 MWt

15. SEF (Enipower Ferrara) - Ferrara (FE), 800 MWe, 1400 MWt

16. Sarmato Energy (repowering) - Sarmato (PC), 47 MWe, 70 MWth

17. Enel Produzione-Castel San Giovanni (PC), 80 MWe transformer. acc. 4 th gr.

Tuscany :

18. Enel Production - Livorno (LI), modified on environmental adaptation

19. Electrabel Italy - Rosignano (Solvay, LI), 400 MWe, 750 MWt

20. Enel Production - Cavriglia (AR), 390 MWe, 700 MWt

Abruzzo :

21. Abruzzo Energy - Gissi (CH), 760 MWe, 1400 MWt

Molise :

22 . Energia Molise - Termoli (CB), 750 MWe, 1300 MWt

Lazio :

23. Enel Production - Civitavecchia (RM), modified carbon

Campania :

24. EDISON - Orta Atella (EC), 780 MWe, 1340 MWt

25. SET (Merloni) - Teversham (EC), 400 MWe, 750 MWt

26. CALENO ENERGY - Sparanise (CE), 800 MWe, 1400 MWt

27. ENERGY PLUS - Salerno, 780 MWe, 1370 MWt

Calabria :

28. Edison Termoelettrica - Altomonte (CS), 800 MWe, 1400 MWt

29. Edison - Simeri Crichi (CZ), 800 MWe, 1360 MWt

30. Thermoelectric Edison - Pianopoli (CZ), 800 MWe, 1360 MWt

31. Rizziconi Energy - Rizziconi (RC), 800 MWe, 1400 MWt

32. EUROSVILUPPO ELECTRIC - Scandale (KR), 800 MWe, 1390 MWt

Puglia:

33. Edison thermoelectric - Candela (FG), 360 MWe, 650 MWt

34. Mirant Italy - San Severo (FG), 390 MWe, 700 MWt

35. Edipower - Brindisi, modified exercise continuation

36. Enipower - Brindisi, 1170 MWe, 2200 MWt

37. Edipower - Brindisi Nord, change.

38. ENERGY - Modugno (BA), 750 MWe, 1350 MWt.

Sardinia :

39. ENEL PRODUCTION - Portsmouth (CA) - modified

for a total of 19,687 MWe, 34,880 MWt.

[Source: Ministry of Productive Activities - Updated to 11 November 2004].

7 Other stations (from 190 to 800 MW) have already been endorsed by the Commission for Environmental Impact Assessment:

1) Italgen - Villa Serio (BG) - 190 MWe and 365 MWt

2) ENERGY - Aprilia (LT) - 750 MWE, 1350 MWt

3) Ansaldo Energia (two soc.) - marshes (NL) - 746 MWe, 1331 MWt

4) E. ON ITALY PROD. - Guidonia Montecelio (RM) - 800 MWe, 1400 MWt

5. CALABRIA ENERGIA - San Ferdinando (RC), 400 MWe, 750 MWt

6. ENERGY - Pisticci (MT), 750 MWe, 1350 MWt

7. THERMAL CELANO (AMPL.) - Celano (AQ) - 170 MWe, 335 mwt

Of the 39 authorized stations, 18 have been issued under Law No 55/2002, the other under the previous legislation.

by Mirella Venturini