PERMITS FOR
THERMOELECTRIC POWER STATIONS ISSUED
IN 2002, 2003, 2004 BY THE MINISTRY OF
ACTIVITIES 'PRODUCTION
(List updated 11 November 2004)
Piedmont :
1. Edison Termoelettirca - Settimo Torinese (TO), 250 MWe, 470 MWt
2. AEM Torino - Moncalieri (TO), 770 MWe, 1350 MWt
3. Piedmont Energy - Leinì (TO), 380 MWe, 700 MWt
4. E. ON PRODUCTION ITALY - Livorno Ferraris (VC), 800 MWe, 1400 MWt
Lombardia :
5. Endesa Italy - Tavazzano (LO), combined cycle conversion
6. Voghera Energia - Voghera (PV), 400 MWe, 750 MWt
7. Enipower - Erbognone Ferrera (PV), 1040 MWe, 1850 MWt
8. ASM AMGS BS and VR - Ponti sul Mincio (MN), 250 MWe, 450 MWt
9. Enipower - Mantova, 780 MWe, 1370 MWt
10. AEM MI - ASM BS (ampliam.) - Cassano d’Adda (MI), 390 MWe, 700 MWt
Veneto :
11. Mirant Generation Portogruaro - Portogruaro (VE), 385 MWe, 680MWt
Friuli Venezia Giulia :
12. Edison-Torviscosa (UD), 800 MWe, 1500 MWt
Liguria :
13. Tirreno Power - Vado Ligure (SV), conversion to combined cycle
Emilia-Romagna :
14. Enipower - Ravenna (RA), 785 MWe, 1370 MWt
15. SEF (Enipower Ferrara) - Ferrara (FE), 800 MWe, 1400 MWt
16. Sarmato Energy (repowering) - Sarmato (PC), 47 MWe, 70 MWth
17. Enel Produzione-Castel San Giovanni (PC), 80 MWe transformer. acc. 4 th gr.
Tuscany :
18. Enel Production - Livorno (LI), modified on environmental adaptation
19. Electrabel Italy - Rosignano (Solvay, LI), 400 MWe, 750 MWt
20. Enel Production - Cavriglia (AR), 390 MWe, 700 MWt
Abruzzo :
21. Abruzzo Energy - Gissi (CH), 760 MWe, 1400 MWt
Molise :
22 . Energia Molise - Termoli (CB), 750 MWe, 1300 MWt
Lazio :
23. Enel Production - Civitavecchia (RM), modified carbon
Campania :
24. EDISON - Orta Atella (EC), 780 MWe, 1340 MWt
25. SET (Merloni) - Teversham (EC), 400 MWe, 750 MWt
26. CALENO ENERGY - Sparanise (CE), 800 MWe, 1400 MWt
27. ENERGY PLUS - Salerno, 780 MWe, 1370 MWt
Calabria :
28. Edison Termoelettrica - Altomonte (CS), 800 MWe, 1400 MWt
29. Edison - Simeri Crichi (CZ), 800 MWe, 1360 MWt
30. Thermoelectric Edison - Pianopoli (CZ), 800 MWe, 1360 MWt
31. Rizziconi Energy - Rizziconi (RC), 800 MWe, 1400 MWt
32. EUROSVILUPPO ELECTRIC - Scandale (KR), 800 MWe, 1390 MWt
Puglia:
33. Edison thermoelectric - Candela (FG), 360 MWe, 650 MWt
34. Mirant Italy - San Severo (FG), 390 MWe, 700 MWt
35. Edipower - Brindisi, modified exercise continuation
36. Enipower - Brindisi, 1170 MWe, 2200 MWt
37. Edipower - Brindisi Nord, change.
38. ENERGY - Modugno (BA), 750 MWe, 1350 MWt.
Sardinia :
39. ENEL PRODUCTION - Portsmouth (CA) - modified
for a total of 19,687 MWe, 34,880 MWt.
[Source: Ministry of Productive Activities - Updated to 11 November 2004].
7 Other stations (from 190 to 800 MW) have already been endorsed by the Commission for Environmental Impact Assessment:
1) Italgen - Villa Serio (BG) - 190 MWe and 365 MWt
2) ENERGY - Aprilia (LT) - 750 MWE, 1350 MWt
3) Ansaldo Energia (two soc.) - marshes (NL) - 746 MWe, 1331 MWt
4) E. ON ITALY PROD. - Guidonia Montecelio (RM) - 800 MWe, 1400 MWt
5. CALABRIA ENERGIA - San Ferdinando (RC), 400 MWe, 750 MWt
6. ENERGY - Pisticci (MT), 750 MWe, 1350 MWt
7. THERMAL CELANO (AMPL.) - Celano (AQ) - 170 MWe, 335 mwt
Of the 39 authorized stations, 18 have been issued under Law No 55/2002, the other under the previous legislation.